Gozo airfield plans not executed yet. But why not try in MSFS. The project envisages the extension of the existing runway (which is currently 174m long) by a further 271-metres, to reach a total length of 445-metres (by 20-metres wide), including a safety area of 30-metres on each side (at each end) of the airstrip. The envisaged upgrades are planned predominately within the airfield-designated territory. Currently the heliport is only used in cases of emergency by the air ambulance helicopter. The proposed airfield will enable the introduction of an inter-island service between Gozo and Malta International Airport (MIA). The runway dimensions preclude the operation of medium and large-sized aircraft, hence the airfield will cater only short take-off and landing fixed-wing aircraft
i cant stop flying here
thx
1 years ago
airline_aviation
Curious to see if it really will be built. Portelli could build and operate it. He is having the money. It would be great to fly direct from Luqa to Xewkija.
2 years ago
pbsflight